Back to Research & Development

Report Detail Page

Design measurement and verification of wastewater emissions reduction and biogas capture to offset natural gas/coal consumption

​This project involved detailed investigation into the construction of a Covered Anaerobic Lagoon (CAL) coupled with biogas capture and combustion to off-set natural gas and coal consumption at  two of Australia's largest beef processing plants.

 

Downloads

Title Size Date published
2.6MB 21/11/2017

Contracts

Contract No. Title Start date End date Funding type
P.PIP.0348
Design measurement and verification of wastewater emissions reduction and biogas capture to offset Natural Gas/Coal consumption
25/02/2013 20/03/2017
MDC PIP

This page was last updated on 05/07/2018