Report Detail Page
Design measurement and verification of wastewater emissions reduction and biogas capture to offset natural gas/coal consumption
This project involved detailed investigation into the construction of a Covered Anaerobic Lagoon (CAL) coupled with biogas capture and combustion to off-set natural gas and coal consumption at two of Australia's largest beef processing plants.
Downloads
Title | Size | Date published |
---|---|---|
2.6MB | 21/11/2017 |
Contracts
Contract No. | Title | Start date | End date | Funding type |
---|---|---|---|---|
P.PIP.0348 |
Design measurement and verification of wastewater emissions reduction and biogas capture to offset Natural Gas/Coal consumption
|
25/02/2013 | 20/03/2017 |
MDC PIP
|
This page was last updated on 05/07/2018